Procurement procedures and price surveys
Manage regulated procedures, price surveys, and qualification stages in one system.
Full-cycle procurement management—from request to contract.
Procurum manages 21 procurement stages in one process. Each stage has defined actions, owners, documents, and decisions.
Need, requester, and budget information.
Procedure, committee, regulations, and documents.
Supplier invitations, questions, and submissions.
Qualification, criteria, and committee decisions.
Results, approval, contract documents, and activity history.
PROCUREMENT
RequestsProceduresSubmissionsContractsMANAGEMENT
SuppliersDocumentsReportsDesign and construction of a new 110/20 kV substation connecting the solar park to the electricity network.
Yes, a joint site visit is scheduled for 03 Sep at 10:00.
AnsweredThe second bidder offers a 48-month warranty; the requirement is 60 months.
Technical specification §4.2 · Bid 02, p. 12Latvenergo procurement specialists participated in defining the system requirements, processes, and workflows. Latvenergo is Latvia's largest power supply company.
Procedures, documents, supplier work, and decisions in one system.
Manage regulated procedures, price surveys, and qualification stages in one system.
Create documents from templates, route them for approval, and retain version history.
Suppliers receive invitations, submit questions, and provide offers in one portal.
The committee evaluates qualification and submissions against defined criteria.
The system records decisions, changes, deadlines, and user actions.
User roles control access; integrations connect procurement with other organisational systems.
Draft procurement documents, research the market, and analyse bids with AI support. Your team reviews the results and makes the decisions.
Turn your needs and reference documents into draft specifications, evaluation criteria, and tender documents, ready to edit.
Electric vehicle charging network construction
Install 12 public charging points, with remote monitoring and a five-year warranty.
The contractor shall supply, install, and commission 12 electric vehicle charging points.
Each charging point shall support remote status monitoring and fault reporting through a central management system.
Editable draft prepared from the procurement brief.
Find products and suppliers that match your requirements. Compare specifications, indicative prices, and availability with sources.
Electric vehicle charging network construction
Public charging stations · at least 150 kW · remote monitoring
| Product / source | Power | Indicative price |
|---|---|---|
| Charging station A [1] | 150 kW | €32,000 |
| Charging station B [2] | 180 kW | €38,500 |
| Charging station C [3] | 150 kW | On request |
Compare the source material before setting your requirements.
Identify unclear requirements, missing information, and conflicting clauses across the tender package before publication.
Electric vehicle charging network construction
The regulations and submission form specify different deadlines for the same procurement.
Regulations · §5.1Bids must be submitted by 12 October 2026 at 14:00.
Submission form · §1Submission deadline: 15 October 2026 at 14:00.
Suggested action: align both deadlines before publication.
Check proposals against tender requirements. Compare bidders and review gaps with evidence from the original documents.
Electric vehicle charging network construction
| Warranty | Bid 01 | Bid 02 |
|---|---|---|
| Required: 60 months | 60 months | 48 months |
Bid 02 offers 12 months less warranty coverage than the specification requires.
Technical specification · §4.2Minimum warranty period: 60 months from acceptance.
Bid 02 · p. 12We provide a 48-month warranty on the installed equipment.
Finding prepared for the procurement committee to review.
AI drafts and analyses. Your team reviews and approves.
The platform base is mandatory. Connect the other modules as you need them and pay only for the ones you use.
19 600 EUR per year
30 000 EUR per year
By agreement
12 000 EUR per year
4 200 EUR per year
2 400 EUR per year
By agreement
68 200 EUR per year
Prices are per year, EUR excluding VAT. Minimum contract term — 3 years.
Request a quoteThe documentation covers the system structure, user roles, procurement stages, and functions. Contact the Mitigate team to request access.
Provide your organisation and contact details. The Mitigate team will follow up about implementation or access to the product documentation.
Ltd Mitigate, 50103381201
We will use the submitted information only to respond to this request.